Invoices raised against contract milestones, material costs taken from the orders you placed, and every rupee the site picked up afterwards — so the quoted margin and the earned one sit side by side.

Start free See the plans
What it does

Money in, money out, per project

Not an accounting package. The part a spreadsheet always gets wrong, because the spreadsheet never hears about the crane.

Invoices from the milestones

Raised against the contract schedule, so the bill and the payment stages cannot drift apart. Draft, issued, paid or cancelled — one status, not a note.

Material cost from the orders

What you actually bought, not what the bill of materials estimated. It comes from the orders placed against the project.

Site costs as they happen

The crane, the second crew visit, the extra conduit. Recorded against the project, which is the only way the earned margin stays honest.

Quoted margin vs earned

The bill was priced at a margin. This shows what that margin became once the costs landed, project by project.

Cash position

What has been collected against what is still outstanding, so you know whether a profitable job is also a paid one.

Figures in the format you read

Lakhs and crores, not eight-digit numbers. The full figure is a hover away when you need it.

How it works

Four things that add up to a margin

Three of them happen on their own; one needs you.

01

Contract sets the value

Approve the bill and the contract carries the revenue and the milestone schedule.

02

Orders set the material cost

What you bought against the project, at what you actually paid for it.

03

You record what the site spent

The costs no bill of materials predicted. This is the step that needs a person.

04

The margin falls out

Revenue, cost, gross profit and cash position — for one project or across all of them.

Why it matters

A quoted margin is a plan

Most EPCs know the margin they priced at and guess at the one they earned. The gap is usually the crane hire, the crew that went back twice, and the material bought at a worse rate than the bill assumed.

  • Revenue from the contract, not from a figure retyped into a sheet
  • Material cost from the orders placed, so a rate change shows up on its own
  • Site costs recorded as they happen, while anybody still remembers them
  • The planned margin read from the bill — not a fixed fifteen percent
  • Outstanding separated from collected, because profitable is not the same as paid
  • Invoices tied to milestones, so nothing gets raised twice or missed
See the bill of materials

Contract value

Revenue, from the signed schedule

Material cost

From the orders you placed

Site costs

Recorded as the job runs

Earned margin

Against what you quoted

Cash position

Collected and outstanding

Questions

What EPCs ask about the books

Mostly whether it replaces their accountant. It does not.

Something not answered here?

Talk to us

No. It is project profitability and milestone invoicing. Your books, your GST filings and your accountant stay where they are.

The contract, where there is one. Otherwise the winning bid. Nothing is retyped, so the project and the invoice cannot disagree.

From the orders placed against the project — what you actually paid, rather than what the bill of materials estimated.

Anything the job picked up that the bill did not predict: crane hire, a second crew visit, extra conduit, transport. You record those as they happen.

The one the bill of materials was priced at. A job quoted at eight percent is not judged against a job quoted at twenty.

Invoices are raised against the contract milestones by design — that is what stops the bill and the schedule drifting apart.